Property Power Supply
Technical Office Kalogeropoulos A. Nikolaos & Chatzidelliou G. Stavroula - Nea Moudania, Halkidiki
The Technical Office Kalogeropoulos A. Nikolaos & Hatzidelliou G. Stavroula, based in Nea Moudania, Halkidiki, fully undertakes the process of powering properties, whether it is a temporary or permanent connection.
Necessary supporting documents
To complete the electrification process, the following are required:
- Electrification application – Completed on the special form of HEDNO.
- Certificate of Connection to Public Utility Networks – Issued by the engineer through the e-adeies information system.
- Installer's Declaration of Responsibility (YDE) – Provided by a licensed electrician and includes:
- Electrical plan of the property
- Electrical installation delivery report
- Inspection protocol according to the ELOT HD 384 standard
- Declaration from the Municipality/Community – Certificate with the square meters of the property for the charging of Municipal Tax (DF), Municipal Fees (DT) and Real Estate Fee (TAP).
Final procedure
In order to complete the power supply and sign the contract with the electricity provider, the following is required:
- Authorization from the property owner, in order for the connection to proceed.
- Conclusion of a contract with the selected electricity provider.
|